FMT Industrieholding GmbH

PULP AND PAPER

  • Aarepapier AG, Niedergösgen (Switzerland)
    Rebuild of the paper machine PM 3
    Dismantling of the press. Installation of the entire press section, the machine drives, the hydraulic and lubrication aggregates as well as field piping and machine piping. Furthermore large-diameter piping of the paper machine and the stock preparation as well as cabling of the press.
  • Palm Paper Ltd., King's Lynn (Great Britain)
    Installation of the new paper machine PM 7
    Installation of one of the largest and most powerful newsprint paper machines worldwide with the following sections: former, press, drier section, calender, pope reel, reel transfer and slitter winder. Installation of fibre recovery, deinking plant, waste paper storage, about 850 electric motors and 170 pumps, hydraulic and pneumatic piping, ventilation system (machine), ventilation system (hall) including heat recovery, vacuum system as well as water preparation.
    Supplier: Voith Paper
  • Mondi Štetí a.s., Štetí (Czech Republic)
    MG Project PM 6 - Main rebuild of the paper machine PM 6
    Installation of the new slitter winder including roll conveying system. Dismantling of the paper machine PM 2. Installation of the base rails, installation of the paper machine PM 6 including the new yankee cylinder and the hotair hood, ventilation system (machine), stock preparation, vacuum system, all lubrication and hydraulic aggregates, machine drives, stock pipe, edge trim suction as well as the entire hydraulic, pneumatic and lubrication piping.
    Suppliers: Voith Paper (paper machine), Rollteck (slitter winder).
  • Swedish Tissue, Kisa (Sweden)
    Rebuild of the tissue machine PM 3
    Dismantling of the existing tissue machine, mechanical installation of the new tissue machine, mechanical installation of the stock preparation and the ventilation system, rebuild of the steam and condensate system as well as start-up assistance.
    Customer: Andritz AG, Graz (Austria)
  • Norske Skog, Skien/Honefoss (Norway)
    Relocation of a TMP plant
    Dismantling in Skien (Norway): Complete dismantling of a TMP-plant including marking, documentation, packing as well as the complete logistic handling.
    Re-installation in Honefoss (Norway): Complete mechanical and electrical re-installation of the TMP-plant.
  • Norske Skog, Skien (Norway)
    Relocation of a newsprint paper production line from Norway to Brazil
    Complete mechanical and electrical dismantling of the paper machine PM 7 including marking, documentation, packing, logistic handling as well as shipment to Brazil.
  • Mondi Packaging, Frantschach (Austria)
    Main rebuild of PM 8 and PM 6
    Replacement of the entire machine drive, replacement of the gears in the gear boxes, replacement of the entire recirculating oil lubrication system as well as replacement of the Clupak-cylinder.

    Rebuild/new installation of the steam and condensate system of PM 6 and PM 8
    Rebuild/new installation of the complete steam and condensate system of the drier section of the PM 8, installation of the measure and control system as well as the impulse pipes. Dismantling and new installation of the steam joints of the PM 6 as well as installation of the measure and control system and the impulse pipes.

    Revision of PM 6 and PM 7
    Refurbishment of the HP hoods 1 and 2, manufacture and installation of new brackets, adjustment and replacement of the pneumatic adjusting cylinders as well as check and replacement of cardan joints at the drives of wet section and drier section.

    Boiler revision
    Revision of the bark boiler, revision of the electric filter at CK II, CK III, the bark boiler and the lime kiln, revision of the evaporation plant as well as revision of CK II and CK III.
  • Sappi Ehingen, Ehingen (Germany)
    Main rebuild of the production line PM 6/ SM 6
    Project "Geminus"
    Main rebuild of the production line PM 6 / SM 6 during a main shut down period of not even one month. In peak times, FMT coordinated up to 320 fitters on the site.
  • Saica, Zaragoza (Spain)
    Installation of the new paper machine PM 10
    Complete installation of the new production line PM 10 from headbox to pope reel as well as installation of the slitter winder including optimisation works and start-up assistance.
  • SCA, Aschaffenburg (Deutschland)
    Main rebuild of the paper machine PM 1
    Dismantling of the existing paper machine PM 1. Re-installation of the new paper machine consisting of headbox, former, pulper, drier section, speed-sizer, hydraulic and pneumatic control system, lubrication systems including all aggregates as well as the base plates. Rebuild of the pope-reel. Electrical/C&I installation. This main rebuild was realised within only 42 days! In peak times, FMT coordinated about 165 fitters on the site.
  • Mondi Ltd., Merebank (South Africa)
    Main rebuild of the paper machine PM 31
    Dismantling of the existing paper machine PM 31. New erection of the new paper machine consisting of former, press section, drier section, speed-sizer, calender, drier hood and pope reel. Piping of the hydraulic and pneumatic control system and the central oil lubrication system.
  • Pulp Mill Stendal, Arneburg (Germany)
    Complete Erection of the Stendal Pulp Mill
    Lead Management of the consortium AFI, technical leadership

    1. Overall project coordination and administration
    Lead management of the consortium AFI (project director) | Site management and technical leadership | Warehousing | Monthly progress follow up | Monthly update of time schedule | Doc-control and distribution | Coordination of the FMT subcontractors

    2. Installation works
    Installation of all the mechanical equipment | Installation of steelstructures (4.500 tons of platforms, pipe racks and building structures) | Tank insulations (60.000 m² of insulation) | Installation of all the electrical equipment (950 MCC’s, VDF’s and transformers) | Installation of the instrumentation (> 2.000 hook ups) | Grouting (non shrinking and concrete) | Refractory work lime kiln (800 tons) | Acid proof tile lining works | Painting of tanks and steelstructures | Concrete lining of tanks

    Manpower AFI in peak times: > 1.800
    Manpower FMT in peak times: ~ 500
  • m-real, Äänekoski (Finland)
    Main rebuild of the board machine BM 1
    Dismantling of the existing board machine from wire section and complete erection of the new BM 1. Piping of the hydraulic and pneumatic control system, the central oil and grease lubrication system as well as installation of the machine-oriented control and instrumentation systems.
  • SCA Graphic Laakirchen, Laakirchen (Austria)
    SCA Graphic Laakirchen, Laakirchen (Austria)
    SCA Graphic Laakirchen, Laakirchen (Austria)
    Complete erection of the production line PM 11 Convertible
    Technical and commercial leadership of the consortium FISK
    Due to the extent and complexity of the project, the complete erection was carried out under integration of consortium partners. FMT was responsible for the technical and commercial leadership as well as for the safety coordination of the consortium FISK, which sybolises the companies behind the consortium: FMT (responsible for paper machine, ventilation system, hydraulic system, central lubrication system, auxiliary equipment, technological steel structure), Integral (process piping), Siemens (Industrial processing electrical services, building electrical services, instrumentation) and Kremsmüller (calender, slitter winder, process piping, inuslation). Manpower in peak times: about 600 skilled fitters of consortium FISK.
  • Paper Mill Palm, Woerth (Germany)
    Installation of the production line PM 6
    Project "Rio Grande"
    Complete mechanical erection of the new production line PM 6, mainly consisting of stock preparation, constant part, vacuum system, paper machine, 2 slitter winders, roll conveying system, auxiliary equipment, hydraulic and pneumatic control system, control system and central lubrication system. Electrical/C&I installation of stock preparation, constant part, slitter winder, steam and condensate system including supply of material and manufacture of the control cabinets. Manpower in peak times: about 200 skilled FMT fitters.
  • Kappa-Central Pac S.A.S., Melun (France)
    Relocation of a corrugating machine: mechanical and electrical dismantling of a corrugation machine in France and re-erection in Spain.