KW Emsland, Lingen (Germany)
Combined Cycle Power Plant (Multi-Shaft, 800 MW)Mechanical and electrical/C&I installation of a steam turbine (HIP+LP) including generator and condenser (hot box), 2 gas turbines including generator, installation of the sound enclosures and auxiliary equipment as well as insulation. -
CCPP T-Power, Tessenderlo (Belgium)
Combined Cycle Power Plant (Single-Shaft, 400 MW)Mechanical and electrical/C&I installation of a HRSG unit, a gas turbine, a generator as well a steam turbine including condenser. Mechanical installation of the auxiliary equipment, the sound enclosures, the fire fighting system as well as insulation. -
CCPP Severn Power, Newport (Great Britain)
Combined Cycle Power Plant (2 x Single-Shaft, 824 MW)Mechanical installation of two gas turbines, two steam turbines, two generators and auxiliary equipment as well as insulation and installation of the sound enclosures. -
HKW Walsum, Walsum (Germany)
Steam turbine plant (750 MW)Installation of the HP turbine, the IP turbine and the two LP turbines, the generator, the preheater, the feed water tank and miscellaneous auxiliary equipment as well as insulation. -
CCGT Didcot, Didcot (Great Britain)
Rebuild CCGT plant (Multi-Shaft, 1360 MW)Dismantling of two gas turbines, two filter houses and the exhaust-gas diffusors. Re-installation of two gas turbines (243 MW each) including sound enclosures as well as piping for the cooling water system and the fuel gas pipes of the two gas turbines. -
CPT DONG Energy, Mongstad (Norway)
Gas-fired CHP Plant (2 x 130 MW)Mechanical and electrical / C&I installation of two gas turbines (type Frame 9E) and two generators as well as auxilliary equipment. Installation of on and off base piping, sound enclosures, air inlet channel, filter house, exhaust-gas diffusor as well as painting. -
OMV, Rainbach III (Austria)
Gas compressor stationMechanical erection a gas compressor station with one gas turbine compressor unit constisting of a performance increased gas turbine and a pipline compressor. -
Danube Power Station Freudenau, Vienna (Austria)
Turbine plantManufacture, supply and installation of the piping of 4 turbines including trial. -
ENTABAN, Ferrol - A Coruna (Spain)
Biodiesel plantSupply and installation of the entire piping system of a RME biodiesel plant (capacity 200.000 tons/year) as well as installation of equipment. FMT processed more than 8000 meters of different high-class pipe materials. -
KW Hintermuhr, Muhr (Austria)
Pumpturbine (70 MW)Mechanical installation of a Francis pumpturbine incl. turbine governor, ball valve, butterfly damper, cooling water system, drainage system, surface drawdown as well as headwater and tailwater side connecting pipes. Mechanical installation of the generator. -
MHKW AVA Nordweststadt, Frankfurt (Germany)
Waste incineration plantComplete mechanical erection of the combustion plant and the flue gas cleaning plant of a 4-line waste-to-energy plant (line 1 and 2). -
CCPP Pont sur Sambre, Pont sur Sambre (France)
Combined Cycle Power Plant (Single-Shaft, 412 MW)Electrical/C&I installation for gas turbine, generator, steam turbine and auxiliary equipment. Medium voltage cabling. Installation of the main transformer, the auxiliary transformer and the medium voltage switchgears. Installation of the diesel standby set and battery cells. Installation of the aluminium generator bus duct. -
CCPP Timelkam, Timelkam (Austria)
Combined Cycle Power Plant (Single-Shaft, 400 MW)Mechanical installation of a steam turbine (HIP+LP) including condenser, a gas turbine and a generator (Single-Shaft-Design). Installation of the internal pipes and the sound enclosures as well as turbine insulation. -
CHP Öresundsverket, Malmö (Sweden)
Combined Cycle Power Plant (Multi-Shaft, 400 MW)Mechanical and electrical/C&I installation of a steam turbine (HIP+LP) including generator and condenser, a gas turbine including generator, turbine piping, installation of the sound enclosures and auxiliary equipment as well as insulation. -
CCPP Livorno, Livorno Ferraris (Italy)
Combined Cycle Power Plant (Multi-Shaft, 800 MW)Mechanical and electrical/C&I installation of a steam turbine (HIP+LP) including generator and condenser (hot box), 2 gas turbines including generator, gas turbine piping, installation of the sound enclosures and auxiliary equipment as well as insulation. -
CCPP Kårstø, Tysværvåg (Norway)
Combined Cycle Power Plant (Single-Shaft, 418 MW)Mechanical and electrical / C&I installation for a steam turbine (HIP+LP) including generator and condenser, a gas turbine including generator, gas turbine piping, installation of the sound enclosures, the fire fighting system and auxiliary equipment as well as insulation. -
CCPP Herdecke, Huerth (Germany)
Combined Cycle Power Plant (Multi-Shaft, 400 MW)Mechanical installation of a steam turbine (HIP+LP) including generator and condenser, a gas turbine including generator as well as installation of the sound enclosures and insulation. -
CCPP Knapsack, Knapsack (Germany)
Combined Cycle Power Plant (Multi-Shaft, 800 MW)Mechanical installation of a steam turbine (HIP+LP) including generator and condenser, two gas turbines including generator as well as installation of the sound enclosures and insulation. -
CCPP Sagunto, Sagunto (Spain)
Combined Cycle Power Plant (3 x Single-Shaft, 1200 MW)Electrical/C&I installation for gas turbine, generator, steam turbine and auxiliary equipment. Medium voltage cabling. Installation of the main transformer, the auxiliary transformer and the medium voltage switchgears. Installation of the diesel standby set and battery cells. Installation of the aluminium generator bus duct. Testing and start-up. -
BASF, Antwerpen (Belgium)
Combined Cycle Power Plant (Single-Shaft, 400 MW)Electrical/C&I installation: Installation of the main transformer, the auxiliary transformer and the medium voltage switchgears including laying and termination of cables. Installation of the diesel standby set and battery cells. Installation of the generator bus duct. -
CCPP Palos de la Frontera, (Spain)
Combined Cycle Power Plant (Single-Shaft, 3 x 380 MW)Mechanical installation of three units single shaft lines consisting each line of a gas turbine, generator, steam turbine and condensor. Also including the installation of generator piping, insulation, sound enclosurres and auxiliary equipment. Electrical/C&I installation and control system for the entire power plant. Also installation of the bus duct, transformers and switch gears. -
Coolkeeragh CCGT, Londonderry (Northern Ireland)
Combined Cycle Power Plant (Multi-Shaft, 400 MW)Mechanical installation of a 3-stage steam turbine (150 MW) including generator, condenser, piping, spray insulation and accessory equipment. Mechanical installation of a gas turbine (250 MW), generator, piping, air inlet channel, exhaust-gas diffusor and filter house. Electrical/C&I installation of the steam turbine, the gas turbine and the filter house. -
West Offaly Power Station, Shannonbridge (Ireland)
Steam turbine plant (Single-Shaft, 150 MW)Mechanical erection of a steam turbine (HIP and LP), generator, condenser, auxiliary equipment, piping, sound enclosure as well as spray insulation. -
CCPP Campo de Gibraltar, San Roque (Spain)
Combined Cycle Power Plant (Single-Shaft, 2 x 375 MW)Mechanical and electrical/C&I installation of two single shaft turbine sets consisting of a 3-stage steam turbine, generator and gas turbine including condenser, piping, insulation and accessory equipment. Electrical/C&I installation: Installation of cable trays, cable laying and connection as well as installation of control cabinets. -
ALBA Recycling GmbH, Braunschweig (Germany)
Waste sorting plantDismantling and re-erection of a waste sorting plant -
VGT-KEM Lingen, Lingen (Germany)
Topping Gas Turbine Plant Emsland (4 x 60 MW))Mechanical installation (including preliminary start-up):
4 gas turbine strings Rolls Royce Trent 60, air-cooled generator and filter housing
Electrical/C&I installation (including preliminary start-up):
Control cabinets and low-voltage distribution, extension of cable paths, cable pulley, cable connection work and grounding. -
BFG Power Plant Gent, Knippegroen (Belgium)
Steam turbine plant (300 MW)Mechanical and electrical/C&I installation of a steam turbine including generator and condenser.
Installation of the sound enclosures and as well as insulation. -
NPP Olkiluoto, Olkiluoto (Finland)
Installation of the world‘s largest steam turbine plant (1.600 MW)Installation of the HP turbine, three LP turbines and condensers, the generator and the bus duct.
Installation of the turbine-oriented steam pipes.