Find us on Facebook
-
Dunamenti G3, Szazhalombatta (Hungary)
Complete electrical/C&I installation of a HRSG plant. -
CCPP T-Power, Tessenderlo (Belgium)
Complete installation of a HRSG plant supplied by NEM b.v. (horizontal gas flow, natural circulation) behind Siemens SGT 5-4000F gas turbine incl. auxiliary equipment. Total installation quantity: approx. 3.750 tons -
DONG Energy, Mongstad (Norway)
Installation and commissioning assistance for two HRSG units (horizontal gas flow, natural circulation) behind GE-9E type gas turbine (130 MW each) incl. auxiliary equipment. Total installation quantity: approx. 3.010 tons -
Wienstrom, KW Simmering, Vienna (Austria)
Complete installation of a biomass boiler plant (61 MW). Installation quantity: approx. 1.000 t -
District heat Vienna, Leopoldau (Austria)
Modification of the existing 170 MW hot water boiler to low NOx firing system with fuels gas and oil. -
Paper mill Smurfit Nettingsdorfer, Nettingsdorf (Austria)
Thermal calculation for the modification of the gas fired boiler to a low NOx firing system.more details to Paper mill Smurfit Nettingsdorfer -
OMV Refinery, Schwechat (Austria)
Modification of boiler 6 and 7 for SNOx plant. -
voestalpine Stahl, Donawitz (Austia)
Complete installation of a boiler island with combined firing incl. steel structures and external piping. -
EVN AG, PS Korneuburg (Austria)
Modification of the existing HRSG boiler due to new gas turbine parameters. -
Thermal Power Plant 4 Co., Ulaanbaatar (Mongolia)
Parts for the modification o the coal fired boilers no. 1, 2, 3 and 4. -
EVN AG Power Station, Duernrohr (Austria)
Modification of reheater and feed-in of steam from waste incineration plant for coal fired benson type boiler. -
District heat Vienna, Power Station Simmeringer Haide (Austria)
Rehabilitation of the heat recovery steam generator after drum type furnace no. 2. -
Respsol YPF Raffinerie, Tarragona (Spain)
Rehabilitation of the oil and gas fired boiler no. 661-F-1801.